Aqualams fundamentals is to creatively work together with team of professionals to achieve the yearning of the society and knowledge to bridge the gap for lasting total interactions that is beneficial to the society. We have skilled professionals with over 60 years’ experience combined. We are passionate, innovative, target driven to handle projects with deep technical knowledge, we also synergize with clients by carefully communicate the appropriate solutions to projects. We collaborate with other professionals to assist in planning, and cost effective strategies for exceptional difficulties. We often retain professionals with problem solving skills, we resolve difficult problems continuously. It is our believe to always seek, make inquiries and encourage our customers to consider a broader solution that will assist them to address social, financial and environmental effect as well as the technical effect.
S/N | Projects | Year | Architect/Contact | Cost(Naira) | Status |
1 | Mechanical&Electric al Design for Proposed Hostel Development for College Of Medicine University Of Lagos,(Idi Araba) consisting of 80 Rooms on 4 Floors. Services include AirConditioning&ven tilation,Water Services,Fire Hose Reel c/w Pumps, Water Traetment and Sewage Disposal |
2015 | Triarch Nigeria Arc Taiwo Oyeleke 08033733655 |
Project Cost |
Design Stage |
2 | Mechanical&Electric al Design and Supervision Of Terminal Extension For Bristow Helicopters Lagos& Portharcourt including ducted Airconditioning System. |
2015 | Triarch Nigeria Arc Taiwo Oyeleke 08033733655 |
Completed | |
3 | Mechanical & Electrical Supervision of GT Bank Festac and Alhaji Masha(Surulere) Branches |
2014 | Triarch Nigeria Arc Taiwo Oyeleke 08033733655 |
Completed | |
4 | Proposed Fire Hydrant Design and Installation For Society For Family Health Warehouse At Ota,Ogun State |
2014 | Society For Family Health. Abuja Mr Emeka Okafor 08037008922 |
Project Cost 14M |
Under Construction |
5 | Mechanical&Electric al Design for Proposed Renovation of T,H,E,W,&J Wings Of Sodehinde Students Hall at University Of Lagos, consisting of 94 Rooms and 10 Office space on 4 Floors. Services include AirConditioning&ven tilation,Water Services,Fire Hose Reel c/w Pumps, Water Traetment and Sewage Disposal |
New Order Partnership Limited Arc Tony Iweka 08033238111 |
Project Cost
386M |
Contract Award Stage | |
6 | Mechanical Design for Proposed Cento House Development For Cento Group Nig Ltd at Plot 16 Banana Island Foreshore Estate at Eti Osa LGA Lagos State consisting of 12Flats on 4 Floors. Services include Ducted AirConditioning&ven tilation,Water Services, Swimming Pool,Fire Hose Reel c/w Pumps, Water Traetment and Sewage Treatment etc |
2014 | Matrix Int’l Architects Consult Ltd Engr Dauda Abidoye 08038858342 |
Under Construction | |
7 | Mechanical Design for Proposed Shopping Arcade Development along Yidi Road,Off Unity Road,Ilorin Kwara State consisting of 6 Floors. Services include Air Conditioning & ventilation, Water Services,Fire Hose Reel c/w Pumps, Water Traetment and Sewage Treatment etc |
2014 | Archedrest Ltd Ibadan Arc Adeoye Amori 08033598215 |
Project Cost 2.8 B |
Contract Award Stage |
8 | Mechanical&Electrial Design for Proposed Luxury Hotel At Mabushi Cadastral Zone BO6 FCT, Abuja consisting of 5 Floors of 216 guest suites each with fresh Air supply & AC,Sprinkler system,CCTV coverage&Data connection at all points.Water Booster Pumps,Water Services and Sewage Treatment etc |
2013 | Kostarget Projects Ltd Architects Arc Diokpo 08033294037 |
ProjecProject Cost 400M |
Under Construction |
9 | Mechanical&Electrial Design for Proposed Riez Continential Hotel At Joel Ogunaike St, GRA Ikeja,Lagos consisting of 5 Floors of 188 guest suites each with fresh Air supply & AC,Sprinkler System,CCTV coverage&Data connection at all points.Water Booster Pumps,Water Services and Sewage Treatment |
2013 | Kostarget Projects Ltd Architects Arc Diokpo 08033294037 |
Project Cost 300M |
S/N | Projects | Year | Architect/Contact | Cost (Naira) | Status |
10 | Mechanical Design for Proposed Office Complex For Sifax Nig Ltd consisting of 9 Floors office space with, Lift, Fire fighting systems, Water Booster Pumps, Water and Sewage Treatment plants service building, etc |
2013 | Legend Architects Arc Felix 08035019697 |
ProjecProject Cost 250M |
Contract Award Stage |
11 | Mechanical Design for Proposed Development For Major Gen Victor Odeka at Admiralty Road, Lekki Lagos consisting of 10 Block of Flats on 8 Floors and 4 Nos Duplex with, Lift, Fire fighting systems, Water Booster Pumps, Water and Sewage Treatment plants service building, etc |
2013 | DKR Architects Arc Remi Ajose 08037505940 |
Project Cost 280M |
Under Construction |
12 | Mechanical and Electrical Design for Proposed Residential Development For Grace Oyebola Adetula at Adeyemi Lawson, Ikoyi, Lagos consisting of 6Nos Duplex, Swimming pool and service building. |
2012 | Distinkt Nig Ltd Arc Tony Alabi 08057125435 |
ProjecProject Cost 200M |
Completed |
13 | Mechanical Design and supervision of Community Mess Retro Fit consisting of Multipurpose hall,Guest Chalet,Terrace Bar and Lounge,Shops, Gym and Sports centre, Swimming Pool, Water and Sewage Treatments etc. |
2011 | DKR Architects Arc Remi Ajose 08037505940 |
Project Cost 100M |
Completed |
14 | Mechanical Supervision and installation of (FHI 360) Tuberculusis Laboratory For University of Portharcourt, Rivers State. (Including HVAC c/w Hepa filters,Neutralizatio n chamber, Treatment &discharge of Hospital waste) |
2011 | ProDev Ltd Engr Femi Omoniyi 08062358872 |
Project Cost 700M |
Completed |
15 | Fabrication and Calibration of 5000ltrs Diesel surface tank for PM Oil Lagos. |
2010 | PM Oil Lagos/Mosco |
Completed | |
16 | Mechanical and Electrical design for Proposed 4 Nos Duplex for Mr Gbade Alabi at Oniru Estate, Victoria Island Lagos. Nigeria |
2010 | Distinkt Nig Ltd Arc Tony Alabi 08057125435 |
ProjecProject Cost 120M |
Completed
|
17 | Mechanical and Electrical design including Access control and CCTV,DSTV for Proposed Royalty Executive Suite at Uyo, Akwa Ibom State. Nigeria. (3 Floors including Multipurpose Hall, AC, Lift, Fire Fighting, Water and Sewage Disposal) |
2010 | Distinkt Nig Ltd Arc Tony Alabi 08057125435 |
Project Cost 220M |
Design Stage |
18 | Mechanical design of Block of 6 flats for Mr Aderogba at Oniru Estate, Victoria Island, Lagos. (3 Floors including AC, Swimming |
2010 | MacAlams Nig Ltd Engr M.A Alagbe 08023081289 |
Project Cost 180M |
Completed |
S/N | Projects | Year | Architect/Contact | Cost (Naira) | Status |
19 | Mechanical Supervision of Block of 8 flats for VGS Homeland Estates. at Oniru Estate, Victoria Island, Lagos. |
2010 | VGS Homeland Mrs Sogunle 08056663900 |
Project Cost 150M |
Completed |
20 | Fabrication and Calibration of 45,000ltrs Underground Storage Tank) Fabrication and Calibration of 2000ltrs Surface water Storage Tank with Tower Ikota Shopping Mall Ajah, Lagos. |
2009 | RAB Oil Filling Station/Mosco PENTAGONS VENTURES/Mosco |
Completed | |
21 | Mechanical and Electrical Design including CCTV for Proposed Elizade University, Ilara Mokin, Ondo State, Nigeria |
2008 | Kayode Anibaba & Associates. | Project Cost 210M |
Completed |
22 | Fabrication and Calibration of 2000ltrs Diesel Storage Tank) Fabrication and Calibration of 45,000ltrs of underground storage Tank |
2007 | Central Power Global Solution Ltd/Mosco Total Filling Station/Mosco Lagos- Abeokuta Expressway, Ojokoro. |
Completed | |
23 | Mechanical and Electrical design for Proposed Office Development for Peace Heaven Investment Ltd at Oba Akran, Ikeja Lagos. (5 Floors including AC, Lift, Fire Fighting, Water and Sewage Disposal) |
2007 | Mova Realty Ltd Arc Mathew Abu 08033101799 |
Project Cost 180M |
|
24 | Fabrication and Calibration of 5,000ltrs of Diesel Tank-M.T.N Design |
2007 | Procomtel Limited/Mosco | ||
25 | Mechanical design for GT Bank at Ajose Adeogun Street, Victoria Island, Lagos. (5 Floors including AC, Lift, Fire Fighting, Water and Sewage Treatment Plants) |
2006 | CPMS Ltd Eng K.A Adeola 08022910259 |
Project Cost 200M |
|
26 | Mechanical and Electrical Design of office space for The Nigerian Institution of Estate Surveyors and Valuers Lagos Branch.(5 floors) |
J Ajayi Patunola & Co. Mr Patunola 08033979603 |
Project Cost 165M |
||
27 | Mechanical Design of a branch development for FCMB Bank at Akowonjo Branch, Lagos |
2006 | Kayode Anibaba & Associates. Arc Fola Jibowo 08023123844 |
Cost of Services 5.5M |
Completed |
S/N | Projects | Year | Architect/Contact | Cost(Naira) | Status |
28 | Mechanical Design of a branch development for GT Bank at Ikorodu town, Lagos. |
2005 | CPMS Ltd Eng Adeola 08022910259 |
Cost of Services 1.2M |
Completed |
29 | Design and Installation of Central ducted Airconditioning syestems for Mega Plaza Refurbishment at Victoria Island (6 floors |
DKR Architects Arc Remi Ajose 08037505940 |
Cost of Services 65M |
Completed | |
30 | Design and Installation of Ventilation Systems Complete with Fresh Air Filters (Including Fresh Air&Extract Ductwork) for Nigerian Greman Chemical Company Factory Extension at Otta Ogun State |
Perabeam Nig Ltd Anita 08023459926 |
Cost of Services 3.2M |
Completed | |
31 | Design and Installation of Ventilation Systems Complete with Fresh Air Filters (Including Fresh Air&Extract Ductwork) for Nigerian Greman Chemical Company Factory Extension at Otta Ogun State |
2005 | Perabeam Nig Ltd Anita 08023459926 |
Cost of Services 3.2M |
Completed |
32 | Mechanical and Electrical design of 53 housing units, 3 story shopping mall, and recreation area for Ogun State government (Giteco estate) at Otta, Ogun state |
Kayode Anibaba & Associates |
Project Cost 3.5B
|
Under | |
33 | Mechanical Design for Guaranty Trust Bank Surulere branch, Lagos. |
2004 | CPMS Ltd Eng Adeola 08022910259 |
Project Cost 65M |
Completed |
34 | Mechanical and Electrical design for Mr Bigg`s fast food outlets at Akpakpava road Benin city and Owerri, Imo state |
2004 | Gilda Nig Ltd Arc Laide Gbadamosi 08033075440 |
Project Cost 65M |
Completed |
35 | Mechanical and Electrical design of residential development for Silver trust insurance brokers Ltd at Itedo Village Lekki, Lagos State |
2004 | Multi-Tech Associates Arc Tolu Fowode 08023598744 |
Cost of Services 25M |
Completed |
36 | Mechanical and Electrical design for Lagos State University Teaching Hospital (Cancer Screening& Treatment Centre) at Ikeja, Lagos |
2004 | Al-Hadil Nig Ltd. Arc Egbeyemi. 08023697169 |
Cost of Services 25M |
Completed |
S/N | Projects | Year | Architect/Contact | Cost(Naira) | Status |
37 | Mechanical and Electrical design including DSTV,CCTV and Access control for 30 hotel suites and 3 halls for Foreshore properties at Dolphin extension Ikoyi, Lagos |
2004 | Multi-Tech Associates. Arc Tolu Fowode 08023598744 |
Project Cost 225M |
Completed |
38 | Mechanical design of 8 storey office development with basement (Including Central ducted type Air Conditioning Systems and Automatic Sprinkler System) for Standard Chartered Bank at Adeola Odeku street, Victoria island Lagos. |
2003 | Miu-Beta Engineers. Eng C.p Mobee 08033059642 |
Project Cost 360M |
Design Stage |
39 | Design and Supervision of Central ducted air conditioning systems for Ascendants of divine holy order of mishen, at Onipanu, Lagos. |
2003 | Al-Hadil Nig Ltd Arc Egbeyemi. 08023697169 |
Project Cost 2.85M |
Completed |
40 | Design and Supervision of mechanical and electrical services for Mrs Idowu Akinola at 89 Agege Motor Road Idi Oro Mushin Lagos. (4Nos 2 bedroom flat with Warehouse on 3 floors) |
2003 | Mrs. Akinola 08023630185 |
Cost of Services 125 M |
Completed |